The team handled structural elements, repairs and restoration works with excellent attention to detail. They were able to retain key architectural features while improving the performance of the building, and they consistently discussed options with us before making any changes that could impact the original fabric. The standard of workmanship throughout was outstanding, and the site was always kept organised and safe.

Quality control was evident at every stage. The build was completed to a very high standard, with a strong finish across structural work, internal areas and external detailing. Any issues that arose during the project were dealt with quickly and professionally, and the team were proactive in making sure everything was right rather than simply “ticking the box”.

AG were professional and methodical from the outset. They planned the works in a way that maintained safety and compliance, while also helping us minimise disruption to production. Their coordination between structural activity and electrical works was strong, and it gave us confidence that the project was being managed properly rather than as separate, disconnected tasks.

From mobilisation onwards, the team were organised and professional. They explained the process clearly, maintained a tidy working environment and were considerate of tenants’ routines. The damp treatment works were completed thoroughly, with good attention to detail in the preparation and finishing stages, and the kitchen installation was completed to a high standard with strong overall fit and finish.

The roof works were completed with strong attention to detail, including careful preparation, safe access arrangements and tidy execution. The extension element was planned and delivered in a way that complemented the existing building rather than competing with it, and AG were proactive in discussing materials, detailing and sequencing to ensure it remained appropriate for the site.